No. Project Location Period
1. Rigger team leader Norway (Tromsø) 2019-08 – 2020-08
2. 6 x Enercon E-66 dismantling and disposal Germany 2020-09 – 2020-12
3. Nordex N90 dismantling and transport to Lithuania Netherlands 2021-02 – 2021-03
4. 3 x Enercon E-70 foundation preparation Sweden 2021-09 – 2021-12
5. 3 x Enercon E-70 assembly Sweden 2022-03 – 2022-04
6. 7 x Enercon E-66 dismantling, 4 WTGs to Lithuania, 3 to Australia Netherlands 2022-04 – 2022-08
7. 2 x Nordex N-90 assembly Lithuania 2022-09 – 2022-10
8. 2 x Enercon E-66 dismantling and transport Germany → Lithuania 2022-11 – 2023-01
9. 12 x Enercon E-138 blade replacement Sweden 2022-07 – 2022-12
10. 2 x E-40 and 2 x E-66 dismantling and disposal Germany 2023-02 – 2023-05
11. 1 x Enercon E-66 construction Lithuania 2023-03
12. 1 x Enercon E-40 construction Lithuania 2023-03
13. 10 x Enercon E-138 construction Sweden 2023-04 – 2023-06